色偷偷噜噜噜亚洲男人,欧美性天美性,国产精品538一区二区,一级毛片AAAAAA免费看自拍

Produced Watre Treatment & Field Injection

Core Business > Produced Watre Treatment & Field Injection > Produced Watre Treatment & Field Injection

Produced Watre Treatment & Field Injection

Produced Watre Treatment- CFU


Sic Membrane

Produced Water TreatmentCFU

As the exclusive partner in China for the sales and fabrication of Cameron TST CFU unit for the Chinese market, TDS cooperates with Cameron-TST to promote the New Generation CFU technology in Asia Pacific Region. TDS can provide the complete water treatment solutions and services for the customers, including the design, process guarantee and mechanical guarantee for water treatment system, the fabrication, installation and commissioning for CFU package.

 

The type select and design of the New Generation CFU technology can be realized with respect to the variable requirement of the composition of the produced water, capacity, oil in water content, temperature and oil droplet size distribution.  

image022  3D Model of CFU

l 


 

l  Advantages

What’s new Generation?

n   Multiple separation stages within one vessel

n  Need for several vessels in serial is eliminated

n  Handle higher OIW inlet concentration

n   No tangential inlet. Flexible diameter /height ratio

n  More flexible design and cheaper fabrication

n  Less space required and easier adaptation into existing installation

n   Multiple internal feed distribution

n  Better internal mixing and contact between gas bubbles and oil droplets

n  Less sensitive to scaling up vessels

n   No conflict with existing patents. The technology is worldwide patent pending.

 

l  Applications

The solution could be a standalone technology replacing the whole traditional water train. It could be replacing part of the existing system, be in parallel when there is a need for increased capacity or it could act as a polishing unit downstream of existing technology. 

 

l  CFU Pilot Test:

If possible, TDS would always recommend a pilot test. The test unit has a weight of only 300 kg and is easy to transport to the platforms.  Based upon data received before the test, we would be able to recommend a test program including tie in points, number of stages, etc.  The test results will give you the exact performance of a full scale unit and will give valuable information both for us and for the Operators.  A test is normally performed in 3-4 days.  


主站蜘蛛池模板: 翼城县| 丰台区| 恩施市| 北京市| 英超| 克山县| 邵武市| 兴义市| 石台县| 永宁县| 阿坝县| 射洪县| 神池县| 开远市| 磴口县| 鲁甸县| 贵德县| 南平市| 石屏县| 宣武区| 陵水| 梁河县| 阳谷县| 安阳市| 东兴市| 宣化县| 延庆县| 中方县| 张北县| 吉木萨尔县| 建昌县| 丹阳市| 西盟| 化隆| 西乌珠穆沁旗| 北海市| 同心县| 泰兴市| 安达市| 沭阳县| 延津县|